Testimonial projet Interxion Marseille
Maxime POTTEAU – Data Center Project Manager Bouygues Energies et Services (September 2020) "We rented about ten "300 KW SMART & Low Delta T" [...]
Maxime POTTEAU – Data Center Project Manager Bouygues Energies et Services (September 2020) "We rented about ten "300 KW SMART & Low Delta T" [...]
Business Group Manager - Bouygues Energies & Services “We had to perform level 4 and 5 (*) tests for a large data center in [...]
Project Manager – Bouygues Energie Services As part of the construction of a new datacenter, we needed to carry out load tests and check [...]
Eirik Øygarden, GREEN MOUNTAIN (April 2020) “Green Mountain rented 120 x 21kW floor standing heat loads for Level 5 commissioning in a recent project. [...]
Project Manager Engineer – BTB GES "I rented 233 6 KW SMART load banks in the connected version to Rentaload in order to carry [...]
Anna Chrabol, Associate Director – WSP (May 2022) « We recently used Rentaload to carry out tests at our data centre in London. We had [...]
Maxime POTTEAU – Data Center Project Manager Bouygues Energies et Services (September 2020) "We rented about ten "300 KW SMART & Low Delta T" [...]
Project Manager– CAPINGELEC (July 2021) CAPINGELEC rented from Rentaload: One 2.4 MW resistive container to test the generators and UPS of a data center; [...]
Project Manager– CAP INGELEC (Dec 2021) "We have hired over 60 6kW rack-mounted load banks from Rentaload to test the electrical and thermal systems in [...]
Hajar BOUFADNA – Business Manager – ENGIE SOLUTIONS (May 2021) "We had to carry out load testing for one of the largest data centers [...]